There are long delays this morning on the Burnfoot-Bridgend road due to road works.
The main Burfoot-Bridgend road, the R238, is closed as work is carried out.
Traffic has been diverted via the ‘Slab Road’, the R239.
There are large volumes of traffic and lengthy tailbacks on the road.
Heavy fog that has descended in the area is also inhibiting driving conditions and motorists are advised to take care.
Tags: